2026-05-06   Deadline 2026-06-08   26013 CABLE PLOUGHING - STRENGLÖGN - Jökuldalur 2 - Austurland (RARIK ohf.)
RARIK ohf., ID No. 520269-2669, Dvergshöfði 2, 110 Reykjavík, invites tenders to submit a tender for Tender No. 26013, Jökuldalur 2, Austurland. The project consists of ploughing works, including the installation of ground-mounted substations and cable distribution cabinets, from Gauksstaðir (opposite Skjöldólfsstaðir) to Grund in Jökuldalur. The works shall be carried out during the period from 23 June to 30 September 2026. High-voltage cables for the project will be delivered at Mjóeyri in … Skoða innkaupin »
2026-05-04   Deadline 2026-06-05   26012 - CABLE PLOUGHING - STRENGLÖGN - JÖKULDALUR 1 (RARIK ohf.)
Rarik ohf., ID No. 520269-2669, Dvergshöfði 2, 110 Reykjavík (hereinafter referred to as the “Purchaser”), invites tenders for the project Jökuldalur 1, Tender No. 26012. The work comprises cable ploughing and the installation of associated equipment in the area extending from the Fossvellir land area up to Skjöldólfsstaðir II. The high-voltage cables are primarily 36 kV three-core cables. The works shall be carried out during the period from 23 June to 30 September 2026. Skoða innkaupin »
2026-04-13   Deadline 2026-05-18   CABLE PLOUGHING - STRENGLÖGN - Vatnshamrar að Ferjubakka - Vesturland (RARIK ohf.)
There are two work sections involved, namely cable laying from Vatnshamrar to Hvítá and from Ferjubakki to Hvítá. The cable installation is a pure transmission line, and therefore no ground-mounted substations are required along the route. The high-voltage cables consist of 3 units of 1x300 mm², 36 kV over approximately 6.3 km, and 3 units of 1x240 mm², 36 kV over approximately 6.3 km. In total, 6 cables are to be ploughed in parallel along a section of approximately 6.3 km. It is requested that fiber … Skoða innkaupin »
2026-03-26   RARIK 25014 - CABLE PLOUGHING - STRENGLÖGN - Mjóifjörður Hesteyrarlína (RARIK ohf.)
The work involves cable laying over approximately 2 km from Selhella into Hesteyri, including the installation of ground-mounted transformer substations. The terrain is rough, cut and rocky, with sections on a slope. The work shall be carried out during the period from 11 May to 30 June 2026. Skoða innkaupin »
2026-03-12   26010 - CABLE PLOUGHING - STRENGLÖGN - LAUGARBAKKI - VÍÐIGERÐI (RARIK ohf.)
Rarik ohf. invites tenders for the project Cable Ploughing - Strenglögn - Laugarbakki - Víðigerði no. 26010. The project involves the installation of a 36 kV high-voltage cable together with a 20 mm fibre-optic duct along an approximately 16 km route. Of this total distance, about 2 km is expected to require trench excavation, where four additional cables will be installed along the same section. The works shall commence on 22 June and be completed by 31 August 2026. Skoða innkaupin »
2026-02-27   26017 - CABLE PLOUGHING - STRENGLÖGN - Kelduhverfi - Sandur - Norðurland (RARIK ohf.)
Rarik Ltd., ID No. 520269-2669, Dvergshöfði 2, 110 Reykjavík (hereinafter referred to as the “Contracting Authority”), invites tenders for the project Kelduhverfi Fjöll – Sultir, No. 26017. Installation of a high-voltage cable to replace the existing overhead line, approximately 6.5 km in total. The contract period is from 11 May to 16 June 2026. Skoða innkaupin »
2026-02-27   26018 - CABLE PLOUGHING - STRENGLÖGN - Kelduhverfi - Sandur - Norðurland (RARIK ohf.)
The project consists of installing approximately 3 km of high-voltage cable to replace the existing line. The construction period is from May 11 to June 16, 2026. Skoða innkaupin »
2026-02-24   26011 - CABLE PLOUGHING - STRENGLÖGN - Vesturdalur - Norðurland (RARIK ohf.)
Rarik ohf. requests tenders for the project CABLE PLOUGHING - Vesturdalur - Norðurland, No. 26011. The scope of work includes the installation of approximately 21.5 km of high-voltage cable and approximately 1.0 km of low-voltage cable, as well as the installation of 10 ground-mounted transformer substations and one switching substation. Skoða innkaupin »
2026-02-19   26009 - CABLE PLOUGHING - HRÚTAFJÖRÐUR - NORÐURLAND (RARIK ohf.)
Rarik ohf. is requesting bids for the tender no. 26009 Cable Ploughing, Hrútafjörður, Norðurland. The project involves approximately 6.5 km of high-voltage cable and approximately 0.5 km of low-voltage cable, as well as the installation of 4 ground-mounted substations and one switchgear unit. The estimated project period is from May 26 to June 19, 2026. Skoða innkaupin »
2026-02-12   CABLE PLOUGHING - STRENGLÖGN - LÓN - AUSTURLAND (RARIK ohf.)
The project comprises the installation of a high-voltage power cable in the Stafafellsfjöll mountain area and from Brekka to Aðalbóli, located in Lón within the Municipality of Hornafjörður. In addition, cable installation will be carried out from Reyðará to Holt. A primary high-voltage cable will be installed between Brekka and Aðalból, with subsidiary branch cables connected to the main line. The works also include the installation of substations, high-voltage connection cabinets, and switch houses … Skoða innkaupin »
2025-12-04   25039 - SPENNAHÚS DALVÍK (RARIK ohf.)
The project consists of the construction of a new transformer building for the Purchaser in Dalvík, located on the Purchaser’s site within the Hríshöfði land area. The works concern an unenclosed structure designed to accommodate two transformers in total, with oil sumps and conduit routes located in the basement. The gross floor area of the building is 174.9 m², with a maximum height of 10.9 m measured from the basement floor. Skoða innkaupin »
2025-08-22   25018 - CABLE PLOUGHING - FELLSSTRÖND - VESTURLAND (RARIK ohf.)
Rarik ohf. requests tender for the project Fellsströnd, West Iceland, No. 25018. The project involves a single worksite, i.e. cable laying from Lyngbrekka to Vogur and associated branches of that section, along with soil replacement for ground-mounted substations. The scope includes the following: - High-voltage cables: 3x50q 24kV um 9 km, - Low-voltage cables: approx. 650m, - Ground wire: approx 1,200m. This project also includes 10 ground-mounted substations and 2 distribution cabinets. It is assumed … Skoða innkaupin »
2025-07-08   FRAMEWORK AGREEMENT - UNDERGROUND POWER CABLES (RARIK ohf.)
Rarik ohf. requests tenders for the supply of low- and medium voltage underground power cables, in accordance with the technical description provided for in these Tender Documents for a Framework Agreement. a) Single core cable 36kV 1x240q 35q, estimated three-year quantity 400 km b) Single core cable 36kV 1x300q 35q, estimated three-year quantity 200 km c) Three core cable 36kv 3x150q 35q, estimated three-year quantity 50 km Skoða innkaupin »
2025-07-02   25037 - PRE-QUALIFICATION PROCESS FOR THE UPGRADE OF THE ERP AND BILLING SYSTEMS FOR RARIK (RARIK ohf.)
The Purchaser has decided to upgrade the current ERP system (Microsoft Axapta Dynamics 2012) to Microsoft Dynamics 365 Finance and Operation (hereinafter referred to as “F&O”). Concurrently, the existing billing system (Mecoms 2012 R2) will be upgraded to Mecoms 365. The scope of the anticipated procurement will include the analysis, implementation, hyper-care, and subsequent services related to these upgrades. Skoða innkaupin »
2025-06-12   25033 - CABLE PLOUGHING - STRENGLÖGN - Holtsvegur - Suðurland (RARIK ohf.)
The project involves the installation of a 3x95q 12 kV cable from the intersection of Gaulverjabæjarvegur and Holtsvegur to the farm Brautartunga. The total estimated cable trench length for this project is approximately 10 km. Skoða innkaupin »
2025-06-02   CABLE PLOUGHING - STRENGLÖGN - Mjóanes - Suðurland (RARIK ohf.)
The project entails the installation of a 3x50q 12kV cable, running from the Mjóanes farm to and throughout a summerhouse area located in the Miðfell region. The total estimated cable length is approximately 5 kilometers. Skoða innkaupin »
2025-05-21   SPENNAHÚS - FLÚÐUM (RARIK ohf.)
The project involves the construction of a new substation for the Purchaser at Flúðir in Hrunamannahreppur Iceland, on the Purchaser's land in Hrafnkelsstaðir. It is an uninsulated building for a total of three substations, with oil sump and pipework in the basement. The size of the building is 233 m2 gross, the highest height is 11.1 m from the basement floor. Skoða innkaupin »
2025-05-12   25019 - CABLE PLOUGHING - STRENGLÖGN - HALLKELSSTAÐAHLÍÐ - VESTURLAND (RARIK ohf.)
The project involves two main tasks: laying cables from Álftavatn to Slitvindastaðir and from Gerðuberg to Hallkelsstaðahlíð, including soil replacement for underground substations. The scope includes approximately 21.8 km of 3x50q 24 kV high-voltage cable, around 1,250 meters of low-voltage cable, and about 1,600 meters of earth wire. The installation of 14 underground substations and one connection cabinet is also planned. Skoða innkaupin »
2025-04-15   25003_CABLE PLOUGHING_STRENGLÖGN_Berufjörður_Austurland (RARIK ohf.)
The project involves laying about 15.4km of high-voltage cables in Berufjörður from Kelduskógar to Melshorn and to Eiríksstaðir in Fossárdalur. Installing six substations and laying low-voltage local loops from them. It is expected that fiber optic pipes will be plowed with high-voltage cables. The project also includes laying a 3x50q high-voltage cable at Karlsstaðir for about 0.67km and installing a substation. And laying a 3x95q high-voltage cable at Urðarteigur for about 2.3km and installing a … Skoða innkaupin »
2025-04-15   25029 - CABLE PLOUGHING - STRENGLÖGN - Fljótshlíð - Suðurland (RARIK ohf.)
The project includes laying a 3x95 12kV cable from Hái-Múli to Fljótsdalur, as well as laying a 3x50q 12kV cable from Hái-Múli to a summer residence below Hái-Múli. The total estimated length of the cable is about 7km. Work shall begin on June 5 and be completed no later than July 2, 2025. Skoða innkaupin »
2025-04-05   25007 - CABLE PLOUGHING - STRENGLÖGN - Reyðarfjörður Mjóeyri - Austurland (RARIK ohf.)
Laying of two 240q. 12kV cables, possibly together with fiber optic pipes and a street light cable from the urban area of ​​Reyðarfjörður out to the expected RARIK switch house above Mjóeyrar. The quantities on the tender sheet include the estimated fiber optic pipes in unit 150 and not the street light cable. The work shall be carried out from 26 May to 28 August 2025 Skoða innkaupin »
2025-04-05   25005 - CABLE PLOUGHING - STRENGLÖGN - Eiðaþinghá og Skriðdalur - Austurland (RARIK ohf.)
This is a cable laying project of approximately 3km with the installation of two underground substations in Eiðaþinghá and approximately 4.5km with the installation of three underground substations in Skriðdalur. The work shall be carried out between 9th of June and 20th of July 2025. Skoða innkaupin »
2025-04-01   25017 - CABLE PLOUGHING - STRENGLÖGN - Snæfellsnes (RARIK ohf.)
There are two workplaces, one is cable laying to álmum outside Stykkishólmur and cable laying from Vogaskeið and into Kolgrafafjörður together with soil replacement for underground substations. High-voltage cables are 3x95q 24 kV about 29 km and 3x50q 24 kV about 4.6 km, low-voltage cables about 550m, earth wire about 1.3 km. It is expected that 12 underground substations and 3 junction boxes will be used in this project. It is assumed that the work will start at the beginning 19th of May 2025 and be … Skoða innkaupin »
2025-03-31   25002 - CABLE PLOUGHING - STRENGLÖGN - Lón endurnýjun - Austurlandi (RARIK ohf.)
The work is from Almannaskarð to Stafafell, approximately 20.7 km of 3x240q 24kV high-voltage cable will be laid along with approximately 11.9 km of 3x50q 24kV high-voltage cable. Total of 19 underground substations and one switchgear will be installed. Low-voltage local cables need to be laid from the underground substations towards the farms, approximately 2 km in total. It is expected that fiber optic cables will be laid along the high-voltage cables from the branch to Stafafellsfjöll and into … Skoða innkaupin »
2025-03-27   25012 - CABLE PLOUGHING - STRENGLÖGN - Hafralónsá veiðiheimili (RARIK ohf.)
A 50q 12KV underground cable shall be laid from Hvammur to Tungusel, about 3.5km and then to the expected location of a new fishing lodge, about 4km away, total about 7.5km. The work shall be rendered from May 19th to June 27th 2025. It is planned to put a pipe in the Hafralón River before this work begins and a cable will need to be pulled into the pipe as a part of this project. Skoða innkaupin »
2025-02-05   25035 - Framework Agreement - Pad mounted transformers - Rammasamningur fyrir jarðspennistöðvar (RARIK ohf.)
Framework Agreement for the purchase of pad mounted transformers. The transformers are placed on top of a concrete foundation outdoors and are to be connected to an 11kV or 19kV underground cable system. It is estimated to purchase around 120 pcs. of 11kV transformers and 100 pcs. of 19kV transformers per year during the contract period. Skoða innkaupin »
2025-02-02   25009 - CABLE PLOUGHING - STRENGLÖGN - GÖNGUSKÖRÐ REYKJASTRÖND - NORÐURLAND (RARIK ohf.)
This involves 22km of 12kV cable, which will be laid from Veðramót, along with the installation of 15 substations, as well as about 1km of 1kV local loop cable. The work shall be carried out between June 2 and August 15, 2025. Skoða innkaupin »
2025-02-02   25008 - CABLE PLOUGHING - STRENGLÖGN - MIÐFJÖRÐUR - HÚNAÞING VESTRA - NORÐURLAND (RARIK ohf.)
This involves a 43.5km long 24kV cable installation from Réttarsel to the valley, along with the installation of 20 earthing stations, 2 switchgear stations and the laying of 2.0km of 1kV local loop cable. The work is to be performed from 2 June to 29 August 2025. Skoða innkaupin »
2025-02-02   25011 - CABLE PLOUGHING - STRENGLÖGN- BÁRÐARDALUR ÁFANGI 3 - NORÐURLAND (RARIK ohf.)
The work consists of laying a high-voltage cable 12KV. 95q. from Halldórsstaðir to Mýri and laying a high-voltage cable 12KV. 95q. from Lunderbrekka to the existing transmitter at Rauðafell. Low-voltage cables, earth electrodes and earthing substations shall also be laid and completed. The crossing of the Skjálfandafljót River is excluded. This will be done as a separate project and is not part of this tender. Skoða innkaupin »
2025-02-02   CABLE PLOUGHING - STRENGLÖGN - Rangárvellir Skógarhlíð Dysnes - Norðurland (RARIK ohf.)
This involves the laying of three high-voltage cables 12KV: 1) 240q from Rangárvellir to a new substation on a level at Lónsbakki (the old Húsasmiðjan) 3.5 km. 2) From Rangárvellir to the line corner in Kræklingarhlíð south of Ásláksstaðir 2 km. 3) From the substation S 555 Ósi to Dysnes 2.1 km. These works are being tendered together but will be considered three projects in the RARIK's work sheet. The work shall be carried out from 12 - 30 May 2025. Skoða innkaupin »
2025-01-20   25001 - CABLE PLOUGHING - STRENGLÖGN - ÁSAR HÚNABYGGÐ – NORÐURLAND (RARIK ohf.)
This project involves a 6.5km long 24kV cable ploughing from Skinnastaðir to Mánafoss, along with the installation of 3 sub stations, 1 switch station and the laying of 0.3km of 1kV local loop cable. The estimated construction period is from 1st to 19th September 2025. Skoða innkaupin »
2024-07-17   Purchaser of electricity due to losses in RARIK's electricity distribution system (RARIK ohf.)
Purchaser of electricity due to losses in RARIK's electricity distribution system Skoða innkaupin »
2024-07-03   RARIK 24031 CABLE PLOUGHING STRENGLÖGN Hreiðurborg Suðurland (RARIK ohf.)
The work includes cable laying on a 3x50q Al 12kV cable from Kalaðarnesvegur to Hreidurborg. In total, the estimated slide length is about 1.8 km. The work must be carried out between 2.9.2024 and 20.9.2024. Skoða innkaupin »
2024-07-03   RARIK 24030 CABLE PLOUGHING Strenglögn Þjórsárdalur Suðurland (RARIK ohf.)
This work included the laying of a 3x150q 12kV cable from Hagar to Hjálparfoss. In total, the estimated slide length is about 15km. The work shall be performed between 2.9.2024 and 25.10.2024. Skoða innkaupin »
2024-06-28   24028_CABLE PLOUGHING_STRENGLÖGN_Laxárvatn-Skagaströnd_Norðurland (RARIK ohf.)
This is about 22.5km 36kV of cable ploughing from highway no. 1 to the Skagaströnd substation, parallel to which fiber pipes are to be laid, including wells. The work shall be rendered between August 19th and October 18th 2024. Skoða innkaupin »
2024-05-30   CABLE PLOUGHING - Laxárdalur Þingeyjarsveit (RARIK ohf.)
The project involves the laying of 22 km of high-voltage cable along with the installation of eight substations. Also junction boxes, connection holes, earth electrode and other things that are needed for the work as well as finishing. The work shall be rendered from 15th August to 15th October 2024. Skoða innkaupin »
2024-04-24   Power Transformers (RARIK ohf.)
RARIK ohf., reg.no. 520269-2669, Dvergshöfði 2, 110 Reykjavík, Iceland, requests tenders for the design, manufacture and supply of the following power transformers in accordance with the Tender Documents: 1) One (1) 20 MVA, 66/33 kV power transformer for substation Flúðir; 2) One (1) Spare 1, 25 MVA, 66/19 kV power transformer; 3) One (1) 25 MVA 66/11 kV power transformer for substation Flúðir; 4) One (1) Spare 2, 25 MVA 66/11 kV power transformer; and 5) One (1) 35/15/20 MVA 66/33/11 kV power … Skoða innkaupin »
2024-04-18   24026 - CABLE PLOUGHING - STRENGLÖGN - Vík að Höfðabrekku - Suðurland (RARIK ohf.)
The work includes cable laying 3x95q 24kV two cables from Smiðjuvegi 17 to ground station S057, one to switch station S596 and the other to switch station S690 at Höfðabrekka. The total slide length is about 4.5 km. Work shall begin on July 1, 2024, subject to all permits being in place and completed by July 26, 2024. Skoða innkaupin »
2024-04-17   24020 - CABLE PLOUGHING - STRENGLÖGN - Þverárhlíð og Hreðavatn - Vesturland (RARIK ohf.)
The work includes cable laying to the elms in Þverárhlíð and to the elms at Hreðavatn, together with soil replacement for earth transformer stations. High-voltage cable is 3x25q 24 kV about 15.1 km, low-voltage cables about 1,000 m, ground wire about 2,000 m or about 18.1 km in total. 15 substations and 5 junction boxes are expected in this project. It is assumed that the work will start on July 1 and be completed on September 6, 2024. Skoða innkaupin »
2024-04-17   24018 - CABLE PLOUGHING - STRENGLÖG - Gilsbakki að Kalmanstungu (RARIK ohf.)
The work includes cable laying from Gilsbakki to the "Into the Glacier" tourism service at Hvítá, together with soil replacement for transformers. High-voltage cables are 3x25q 24kV about 12.8 km long, low-voltage cables about 360m, ground wire about 1,400m or about 14.6 km in total. 12 substations and 2 junctions boxes are expected in this project. It is assumed that the project will start on 1st July and end on 6th September 2024. Skoða innkaupin »
2024-04-06   24025 CABLE PLOUGHING - STRENGLÖGN -Flói - Suðurland (RARIK ohf.)
The work includes cable laying from the substation RARIK in Selfoss. From the substation two cables 3x240q 11kV will be laid, one of these cables will go to the mast at Hvítá above Austurkot. The other goes to Kersholt at the intersection of Suðurlandsvegur and Skeiðavegur with a stop at the switch station at Oddgeirshólavegur. A 3x95q 11kV cable is to be laid in parallel, which is used as a distribution cable, and from it there are several cables according to the design. Skoða innkaupin »
2024-03-27   24017 CABLE PLOUGHING STRENGLÖGN Svínadalur vestur (RARIK ohf.)
It is a 33.5km long 12kV cable laying from Hamrakoti to Dalsmyni, together with the installation of 12 ground transformer stations, 1 switching station and the laying of 2.0km of 1kV local nerve cable. The estimated work period is from June 10 to August 2, 2024. Skoða innkaupin »
2024-03-27   24008 CABLE PLOUGHING STRENGLÖGN Heggstaðarnes - Norðurland (RARIK ohf.)
This is about a 10.5km long 24kV cable laying around Heggsstaðarnes, from Bessastaðir to Heggsstaðir, along with the installation of 2 ground transformer stations and the laying of about 200m of 1 kV local cable. The estimated work period is from June 3 to July 5, 2024. Skoða innkaupin »
2024-03-27   24016 CABLE PLOUGHING STRENGLÖGN Vatnsnes Vestur - Norðurland (RARIK ohf.)
This is a 25km long 24kV cable laying around Vatnsnes west from Hjallholt to Saurbær and Þorgrímsstaðardal, along with the installation of 9 substations and one switch station, laying about 1,200m of 1kV local cable. Estimated work period is July 8 to August 30, 2024. Skoða innkaupin »
2024-03-24   24009 - CABLE PLOUGHING - STRENGLÖGN - Rangárþing ytra - Suðurland (RARIK ohf.)
The work consists of four parts work elements. Suðurlandsvegur to Gunnarsholt about 10km, Sörlatunga to Hagakrók about 2km, Heysholt to Flagbjarnarholt about 1.6km and Lækjarbrekka to Lunansholt and Bjalla about 2km. Work shall begin on 10.06.2024, provided that all permits are in place. Skoða innkaupin »
2024-03-24   24048 - CABLE PLOUGHING - STRENGLÖGN - Mýrar - Vesturland (RARIK ohf.)
There are two workplaces, i.e. cable ploughing from Fíflholti to Akrar and from Melur to Hítardalur along with soil exchange for earth transformer stations. High-voltage cables are 3x25q 24 kV about 28.3 km, low-voltage cables about 960 m, ground wire about 1,200 m or about 30.3 km in total. 11 substations and 1 junction box are expected in these works. It is assumed that the work will start at the beginning of June and will be completed 14 weeks later. Skoða innkaupin »
2024-03-24   24047 - CABLE PLOUGHING - STRENGLÖGN - Fiskilækur að Höfn - Vesturland (RARIK ohf.)
Cable laying from Fiskilæk to Höfn together with soil replacement for earth transformer stations. High-voltage cable is 3x95q 12 kV about 7.8 km, low-voltage cables about 455 m, ground wire about 500 m or about 8.8 km in total. 5 substations are expected in this project. It is planned to start the work at the beginning of June and to finish it 4 weeks later. Skoða innkaupin »
2024-03-24   24046 CABLE PLOUGHING - STRENGLÖGN - Dalsmynni að Kolbeinsstöðum - Vesturland (RARIK ohf.)
Cable laying from Dalsmynni to the switching station at Kolbeinsstaðir and the branch to Þverá, together with earth exchange for earth transformer stations. High-voltage cables are 3x95q 24 kV about 11.1 km and 3x25q 24 kV about 2.1 km, low-voltage cables about 180 m, ground wire about 500 m or about 13.9 km in total. 4 substations and 1 junction box are expected in these works. It is assumed that the work will start at the beginning of June and will be completed 7 weeks later. Skoða innkaupin »
2024-03-24   24014 - CABLE PLOUGHING - STRENGLÖGN - Þórshöfn - Hlíð Langanesi - Norðurland (RARIK ohf.)
This is the laying of 14.2 km of high-voltage cable together with the installation of three substations. Also junction boxes, connection holes, earth electrode as well as finishing. Skoða innkaupin »
2024-03-24   24013 - CABLE PLOUGHING - STRENGLÖGN - Gunnarsstaðir - Syðra Áland - Norðurland (RARIK ohf.)
This is the laying of 7.2 km of high-voltage cable along with the installation of four substations. Also junction boxes, connection holes, earth electrode and other things that are needed for the work as well as finishing. Skoða innkaupin »