2024-04-17   24020 - CABLE PLOUGHING - STRENGLÖGN - Þverárhlíð og Hreðavatn - Vesturland (RARIK ohf.)
The work includes cable laying to the elms in Þverárhlíð and to the elms at Hreðavatn, together with soil replacement for earth transformer stations. High-voltage cable is 3x25q 24 kV about 15.1 km, low-voltage cables about 1,000 m, ground wire about 2,000 m or about 18.1 km in total. 15 substations and 5 junction boxes are expected in this project. It is assumed that the work will start on July 1 and be completed on September 6, 2024. Skoða innkaupin »
2024-03-24   24048 - CABLE PLOUGHING - STRENGLÖGN - Mýrar - Vesturland (RARIK ohf.)
There are two workplaces, i.e. cable ploughing from Fíflholti to Akrar and from Melur to Hítardalur along with soil exchange for earth transformer stations. High-voltage cables are 3x25q 24 kV about 28.3 km, low-voltage cables about 960 m, ground wire about 1,200 m or about 30.3 km in total. 11 substations and 1 junction box are expected in these works. It is assumed that the work will start at the beginning of June and will be completed 14 weeks later. Skoða innkaupin »
2024-03-24   24047 - CABLE PLOUGHING - STRENGLÖGN - Fiskilækur að Höfn - Vesturland (RARIK ohf.)
Cable laying from Fiskilæk to Höfn together with soil replacement for earth transformer stations. High-voltage cable is 3x95q 12 kV about 7.8 km, low-voltage cables about 455 m, ground wire about 500 m or about 8.8 km in total. 5 substations are expected in this project. It is planned to start the work at the beginning of June and to finish it 4 weeks later. Skoða innkaupin »
2024-03-24   24046 CABLE PLOUGHING - STRENGLÖGN - Dalsmynni að Kolbeinsstöðum - Vesturland (RARIK ohf.)
Cable laying from Dalsmynni to the switching station at Kolbeinsstaðir and the branch to Þverá, together with earth exchange for earth transformer stations. High-voltage cables are 3x95q 24 kV about 11.1 km and 3x25q 24 kV about 2.1 km, low-voltage cables about 180 m, ground wire about 500 m or about 13.9 km in total. 4 substations and 1 junction box are expected in these works. It is assumed that the work will start at the beginning of June and will be completed 7 weeks later. Skoða innkaupin »