Seljandi: Vinnuvélar Símonar ehf.
3 vistuð innkaup
Vinnuvélar Símonar ehf. hefur sögulega verið seljandi byggingarvinna, vinna við heildar- eða hluta-byggingu og mannvirkjagerð og bygging lagna, fjarskipta- og raflína, fyrir hraðbrautir, vegi, flugvelli og járnbrautir; flatvinna.
Nýleg innkaup þar sem seljandinn Vinnuvélar Símonar ehf. er nefndur
2024-06-28
24028_CABLE PLOUGHING_STRENGLÖGN_Laxárvatn-Skagaströnd_Norðurland (RARIK ohf.)
This is about 22.5km 36kV of cable ploughing from highway no. 1 to the Skagaströnd substation, parallel to which fiber pipes are to be laid, including wells. The work shall be rendered between August 19th and October 18th 2024. Skoða innkaupin »
This is about 22.5km 36kV of cable ploughing from highway no. 1 to the Skagaströnd substation, parallel to which fiber pipes are to be laid, including wells. The work shall be rendered between August 19th and October 18th 2024. Skoða innkaupin »
2024-04-17
24018 - CABLE PLOUGHING - STRENGLÖG - Gilsbakki að Kalmanstungu (RARIK ohf.)
The work includes cable laying from Gilsbakki to the "Into the Glacier" tourism service at Hvítá, together with soil replacement for transformers. High-voltage cables are 3x25q 24kV about 12.8 km long, low-voltage cables about 360m, ground wire about 1,400m or about 14.6 km in total. 12 substations and 2 junctions boxes are expected in this project. It is assumed that the project will start on 1st July and end on 6th September 2024. Skoða innkaupin »
The work includes cable laying from Gilsbakki to the "Into the Glacier" tourism service at Hvítá, together with soil replacement for transformers. High-voltage cables are 3x25q 24kV about 12.8 km long, low-voltage cables about 360m, ground wire about 1,400m or about 14.6 km in total. 12 substations and 2 junctions boxes are expected in this project. It is assumed that the project will start on 1st July and end on 6th September 2024. Skoða innkaupin »
2024-03-27
24017 CABLE PLOUGHING STRENGLÖGN Svínadalur vestur (RARIK ohf.)
It is a 33.5km long 12kV cable laying from Hamrakoti to Dalsmyni, together with the installation of 12 ground transformer stations, 1 switching station and the laying of 2.0km of 1kV local nerve cable. The estimated work period is from June 10 to August 2, 2024. Skoða innkaupin »
It is a 33.5km long 12kV cable laying from Hamrakoti to Dalsmyni, together with the installation of 12 ground transformer stations, 1 switching station and the laying of 2.0km of 1kV local nerve cable. The estimated work period is from June 10 to August 2, 2024. Skoða innkaupin »