Seljandi: Línuborun ehf.
4 vistuð innkaup
Línuborun ehf. hefur sögulega verið seljandi byggingarvinna, vinna við heildar- eða hluta-byggingu og mannvirkjagerð og bygging lagna, fjarskipta- og raflína, fyrir hraðbrautir, vegi, flugvelli og járnbrautir; flatvinna.
Nýleg innkaup þar sem seljandinn Línuborun ehf. er nefndur
2025-05-21
SIG01 Installation of water and electricity supplies for work camps (Landsvirkjun)
The contract includes infrastructure such as water and electricity supply for work camps for the expansion of Sigalda Power Station. Main quantities of the works can be found in the tender documents. Skoða innkaupin »
The contract includes infrastructure such as water and electricity supply for work camps for the expansion of Sigalda Power Station. Main quantities of the works can be found in the tender documents. Skoða innkaupin »
2024-04-06
24025 CABLE PLOUGHING - STRENGLÖGN -Flói - Suðurland (RARIK ohf.)
The work includes cable laying from the substation RARIK in Selfoss. From the substation two cables 3x240q 11kV will be laid, one of these cables will go to the mast at Hvítá above Austurkot. The other goes to Kersholt at the intersection of Suðurlandsvegur and Skeiðavegur with a stop at the switch station at Oddgeirshólavegur. A 3x95q 11kV cable is to be laid in parallel, which is used as a distribution cable, and from it there are several cables according to the design. Skoða innkaupin »
The work includes cable laying from the substation RARIK in Selfoss. From the substation two cables 3x240q 11kV will be laid, one of these cables will go to the mast at Hvítá above Austurkot. The other goes to Kersholt at the intersection of Suðurlandsvegur and Skeiðavegur with a stop at the switch station at Oddgeirshólavegur. A 3x95q 11kV cable is to be laid in parallel, which is used as a distribution cable, and from it there are several cables according to the design. Skoða innkaupin »
2024-03-24
24009 - CABLE PLOUGHING - STRENGLÖGN - Rangárþing ytra - Suðurland (RARIK ohf.)
The work consists of four parts work elements. Suðurlandsvegur to Gunnarsholt about 10km, Sörlatunga to Hagakrók about 2km, Heysholt to Flagbjarnarholt about 1.6km and Lækjarbrekka to Lunansholt and Bjalla about 2km. Work shall begin on 10.06.2024, provided that all permits are in place. Skoða innkaupin »
The work consists of four parts work elements. Suðurlandsvegur to Gunnarsholt about 10km, Sörlatunga to Hagakrók about 2km, Heysholt to Flagbjarnarholt about 1.6km and Lækjarbrekka to Lunansholt and Bjalla about 2km. Work shall begin on 10.06.2024, provided that all permits are in place. Skoða innkaupin »
2024-03-21
24010 - CABLE PLOUGHING Suðursveit Austurland (RARIK ohf.)
The work consists of the renewal of three sections of the distribution system in Suðursveit from Smyrlabjargaraarvirkjun to Reynivellir. It is planned to start the work in June and to finish it in August. Skoða innkaupin »
The work consists of the renewal of three sections of the distribution system in Suðursveit from Smyrlabjargaraarvirkjun to Reynivellir. It is planned to start the work in June and to finish it in August. Skoða innkaupin »