Innkaup: Bygging flugvalla
Ein vistuð innkaup
Nýleg innkaup á bygging flugvalla í Ísland
2022-07-01
construction aircraft groundworks for Akureyri Airport (Isavia Innanlandsflugvellir ehf)
The work involves the laying of the upper substructure of the apron as well as the lower substructure in part, sewerage and drainage pipes, electrical wiring, concrete wells and foundations and oil separators as well as associated side works. Asphalt laying is not part of this work. Skoða innkaupin »
The work involves the laying of the upper substructure of the apron as well as the lower substructure in part, sewerage and drainage pipes, electrical wiring, concrete wells and foundations and oil separators as well as associated side works. Asphalt laying is not part of this work. Skoða innkaupin »