14867 — Drilling a Water Borehole for Snow Making System (Reykjavik Procurement Office)
The municipalities of Reykjavík, Mosfellsbær, Seltjarnanesbær, Kópavogsbær, Hafnarfjarðarbær and Garðabær have reached an agreement regarding snow-making system in the ski areas of the capital area. The agreement means that during 2020-2024, the municipalities will be investing in the renewal of their snow-making system. The project involves drilling a water borehole to down to 350 m depth, to prevent the borehole the first 300 m are cased with 14" casing and 16" drill bit and below that 50 m are bored … Skoða innkaupin »
The municipalities of Reykjavík, Mosfellsbær, Seltjarnanesbær, Kópavogsbær, Hafnarfjarðarbær and Garðabær have reached an agreement regarding snow-making system in the ski areas of the capital area. The agreement means that during 2020-2024, the municipalities will be investing in the renewal of their snow-making system. The project involves drilling a water borehole to down to 350 m depth, to prevent the borehole the first 300 m are cased with 14" casing and 16" drill bit and below that 50 m are bored … Skoða innkaupin »
2018-11-12
ONVK-2018-14 Drilling in Engidalur (Orka náttúrunnar ohf.)
ON Power (Orka náttúrunnar) plans to drill 3 fresh water wells in Engidalur for Hellisheidi Power Plant. Engidalur is defined as a water conservation field and is located approximately 5 km north of Hellisheidi Power Plant. There is a gravel road from the Power Plant to the drill site in Engidalur. The wells will be cased with cemented 22 ½“ production casing and the total depth will be 200 – 250 m with a ø16“ — ø17 ½“ open production section. ON Power will provide ø22 ½“ casing but the Contractor will … Skoða innkaupin »
ON Power (Orka náttúrunnar) plans to drill 3 fresh water wells in Engidalur for Hellisheidi Power Plant. Engidalur is defined as a water conservation field and is located approximately 5 km north of Hellisheidi Power Plant. There is a gravel road from the Power Plant to the drill site in Engidalur. The wells will be cased with cemented 22 ½“ production casing and the total depth will be 200 – 250 m with a ø16“ — ø17 ½“ open production section. ON Power will provide ø22 ½“ casing but the Contractor will … Skoða innkaupin »