2024-12-11
Vatnsfell water-diversion canal - Cofferdam construction, dewatering and removal of accumulated sediments (Landsvirkjun)
Landsvirkjun plans to remove accumulated sediments from Vatnsfell water-diversion canal located in the highlands of Iceland, with works commencing early March 2025. The canal is approximately 1900 meters in length, with a bottom width of 6 meters, excavated partly in rock and partly in loose material. Approximately 40.000 cubic meters of sand and gravel accumulated in the canal be removed using conventional excavation methods hauled to spoil area 2km away. A temporary earthfill dam will be erected at the … Skoða innkaupin »
Landsvirkjun plans to remove accumulated sediments from Vatnsfell water-diversion canal located in the highlands of Iceland, with works commencing early March 2025. The canal is approximately 1900 meters in length, with a bottom width of 6 meters, excavated partly in rock and partly in loose material. Approximately 40.000 cubic meters of sand and gravel accumulated in the canal be removed using conventional excavation methods hauled to spoil area 2km away. A temporary earthfill dam will be erected at the … Skoða innkaupin »
2024-03-19
Vatnsfellsskurður - Cleaning of sediment from the canal above the valve structure (Landsvirkjun)
The work consists of cleaning the sediment that has settled in Vatnsfellsskurður above the valve structure from the canal and placing it in a deposition area north of the dike outside of Þórisvatn. The outer part of the canal, next to Þórisvatn, which consists of tuff layers, see details on the overview. It is foreseeable that all work will have to be done from a barge on the canal. The hole or wedge must be drilled and blasted, but the loose material can be pumped. In the spring of 2024 and 2025, the … Skoða innkaupin »
The work consists of cleaning the sediment that has settled in Vatnsfellsskurður above the valve structure from the canal and placing it in a deposition area north of the dike outside of Þórisvatn. The outer part of the canal, next to Þórisvatn, which consists of tuff layers, see details on the overview. It is foreseeable that all work will have to be done from a barge on the canal. The hole or wedge must be drilled and blasted, but the loose material can be pumped. In the spring of 2024 and 2025, the … Skoða innkaupin »