Nesjavellir Geothermal Power Plant - Control System Update

Orka náttúrunnar ohf.

The Works of the ONIK-2021-02 constitute of a complete Control System Upgrade (CSU) in Nesjavellir power plant.
The existing control system was installed from 1990 – 2004. There have been some upgrades of the originally PLC´s in the meantime but overall, the control system has reached the end of its lifetime.
Nesjavellir power plant is a geothermal powerplant in south-west of Iceland, including electrical generating units, hot and cold-water production and auxiliary systems. The power production is divided into 120 MWe of electrical power and 300 MWt of thermal energy.
The Works includes complete design, manufacture, shop assembly and test, delivery, installation, field testing and commissioning of new Distributed Control System (DCS). The control systems shall be complete with accessories and all necessary associated equipment for making the control systems complete and for warranting a reliable, trouble free and safe operation. The thermal system produces hot water for district he

Lokafrestur

Lokafrestur móttöku tilboða var 2021-12-22. Innkaupin voru birt 2021-11-17.

Hver? Hvað? Hvar?
Saga innkaupa
Dagsetning Skjal
2021-11-17 Útboðsauglýsing
2021-11-24 Viðbótarupplýsingar
Útboðsauglýsing (2021-11-17)
Hlutur
Umfang innkaupanna
Heiti: Command and control system
Tilvísunarnúmer: ONIK-2021-02
Stutt lýsing:
The Works of the ONIK-2021-02 constitute of a complete Control System Upgrade (CSU) in Nesjavellir power plant. The existing control system was installed from 1990 – 2004. There have been some upgrades of the originally PLC´s in the meantime but overall, the control system has reached the end of its lifetime. Nesjavellir power plant is a geothermal powerplant in south-west of Iceland, including electrical generating units, hot and cold-water production and auxiliary systems. The power production is divided into 120 MWe of electrical power and 300 MWt of thermal energy. The Works includes complete design, manufacture, shop assembly and test, delivery, installation, field testing and commissioning of new Distributed Control System (DCS). The control systems shall be complete with accessories and all necessary associated equipment for making the control systems complete and for warranting a reliable, trouble free and safe operation. The thermal system produces hot water for district he
Sýna meira
Lýsigögn tilkynningar
Upprunalegt tungumál: enska 🗣️
Tegund skjals: Útboðsauglýsing
Eðli samnings: Aðföng
Reglugerð: Evrópska efnahagssvæðið (EES)
Sameiginlegur innkaupaorðaforði (CPV)
Kóði: Stjórnar- og eftirlitskerfi 📦
Viðbótar-CPV: Iðnaðarvélar 📦
Framkvæmdarstaður
NUTS-svæði: Ísland 🏙️

Ferli
Tegund ferlis: Samningskaup
Tegund tilboðs: Framlag fyrir alla hluta
Matsforsendur
Hagkvæmasta tilboðið

Kaupandi
Auðkenni
Land: Ísland 🇮🇸
Tegund veitandi yfirvalds: Veitustofnun
Heiti veitandi yfirvalds: Orka náttúrunnar ohf.
Póstföng: Bæjarháls 1
Póstnúmer: 110
Póstbær: Reykjavík
Tengiliður
Vefslóð: https://www.on.is/ 🌏
Tölvupóstur: utbod@or.is 📧
Sími: +354 5166100 📞
Vefslóð fyrir skjöl: https://in-tendhost.co.uk/reykjavikenergy/aspx/Home 🌏

Tilvísun
Dagsetningar
Sendingardagsetning: 2021-11-17 📅
Lokafrestur fyrir framlag: 2021-12-22 📅
Birtingardagsetning: 2021-11-22 📅
Auðkenni
Tilkynningarnúmer: 2021/S 226-596270
OJ-S útgáfa: 226

Hlutur
Umfang innkaupanna
Stutt lýsing:
The Works of the ONIK-2021-02 constitute of a complete Control System Upgrade (CSU) in Nesjavellir power plant.
The existing control system was installed from 1990 – 2004. There have been some upgrades of the originally PLC´s in the meantime but overall, the control system has reached the end of its lifetime.
Nesjavellir power plant is a geothermal powerplant in south-west of Iceland, including electrical generating units, hot and cold-water production and auxiliary systems. The power production is divided into 120 MWe of electrical power and 300 MWt of thermal energy.
Sýna meira
The Works includes complete design, manufacture, shop assembly and test, delivery, installation, field testing and commissioning of new Distributed Control System (DCS). The control systems shall be complete with accessories and all necessary associated equipment for making the control systems complete and for warranting a reliable, trouble free and safe operation. The thermal system produces hot water for district
he
heating of the Greater Reykjavík area.
Lengd: 36 mánuðir

Ferli
Lagagrundvöllur: 32014L0025
Áætlaður fjöldi umsækjenda: 3
Hlutlæg viðmið til að velja takmarkaðan fjölda umsækjanda: See pre-qualification documents.
Tími fyrir móttöku tilboða: 14:00
Tungumál sem hægt er að leggja fram tilboð eða þátttökubeiðnir á: enska 🗣️
Gildistími tilboða: 3 mánuðir

Kaupandi
Auðkenni
Innlent skráningarnúmer: 471119-0830
Tengiliður
Tengiliður: Grétar Þór Jóhannsson
Heimilisfang kaupandasniðs: https://www.on.is/um-on/starfsemi-skipulag/ 🌏
Vefslóð skjala: https://in-tendhost.co.uk/reykjavikenergy/aspx/Home 🌏

Frekari upplýsingar
Endurskoðunaraðili
Nafn: Kærunefnd útboðsmála
Póstföng: Borgartún 21
Póstbær: Reykjavík
Póstnúmer: 105
Land: Ísland 🇮🇸
Tölvupóstur: knu@yfirskattanefnd.is 📧
Vefslóð: https://www.stjornarradid.is/raduneyti/nefndir/nanar-um-nefnd/?itemid=e219adb9-4214-11e7-941a-005056bc530c 🌏
Heimild: OJS 2021/S 226-596270 (2021-11-17)
Viðbótarupplýsingar (2021-11-24)
Hlutur
Lýsigögn tilkynningar
Tegund skjals: Viðbótarupplýsingar
Sameiginlegur innkaupaorðaforði (CPV)
Kóði: Hugbúnaðarpakki og upplýsingakerfi 📦

Tilvísun
Dagsetningar
Sendingardagsetning: 2021-11-24 📅
Lokafrestur fyrir framlag: 2022-01-05 📅
Birtingardagsetning: 2021-11-29 📅
Auðkenni
Tilkynningarnúmer: 2021/S 231-610021
Vísar í tilkynningu: 2021/S 226-596270
OJ-S útgáfa: 231
Heimild: OJS 2021/S 231-610021 (2021-11-24)